Size of Project: Full house renovation

Duration of Project: 2 months

Cost: $185,000

Details: In this dream home renovation, we went in and completely gutted the main floor and then refreshed the second level and basement.  We removed walls, relocated a bathroom to a totally different side of the home, raised a ceiling in the dining room and started construction.  We installed all new floors throughout the entire home, ran new gas for a fireplace, cleaned up and ran new electrical and plumbing, installed a 1,500lb capacity winch within the ceiling that attaches to the chandelier (this feature is for convenience of cleaning the chandelier ) reconfigured the master bathroom, installed custom standing shower and pedestal tub, installed all new kitchen with island and built in pantry, custom built pillars throughout the main level, sanded the golden oak stair case down and stained onyx black, removed sliding doors and installed a large barrier free window that overlooks their pool with waterfall and landscape for mile.